Tenant-to-tenant migrations, on-prem-to-cloud workload moves, and Microsoft 365 cutovers — designed in advance, executed in waves, validated with real users. No big-bang weekends, no "we'll fix the archives later".
BitTitan / Quest / ShareGate / Native
5-10 user pilot + batched waves
2-24 weeks by tier
Mailbox routing + file shortcuts
If two of these sound familiar, this service is scoped for you. If none of them do, the discovery call is short and we will tell you which service actually fits.
M&A / divestiture forcing a tenant-to-tenant cutover in 90 days, including identity, mail, files and Teams.
Mailbox archives and SharePoint sites accumulated over a decade that nobody can classify.
On-prem workloads pinned by license terms, ISV support windows, or technical debt nobody documented.
No hand-waving. If it is on this list, it is in scope from day one. If it is not, it lives in the out-of-scope section further down or is a separate engagement we will tell you about up front.
Three phases. Named owners per phase. Documented hand-offs. You always know which week of the engagement you are in.
Full inventory across identities, mailboxes, SharePoint, Teams, OneDrive, archives. Tool selection. Wave plan with timelines, rollback criteria, and communication schedule. Risk register signed off by both sides.
Pilot wave with 5-10 representative users. Lessons applied. Production waves rolled out per the plan. Coexistence (mailbox routing, file shortcuts) keeps the business running between waves.
Every tier ships the same technical depth — the difference is whether we hand the keys back, keep them, or build you a sovereign exit kit. Final scope and fee are quoted after a short discovery call. No hourly billing.
SMB tenants under 100 seats moving to or between M365 / Workspace, single-region.
We do not resell from a price-comparison engine. Every vendor in this service has a direct partner relationship with us — meaning support tickets escalate, license terms are honoured, and the margin stays inside the same vendor list price you would pay direct.
Honest exclusions are how we keep delivery fast. If something you need is in the out-of-scope column, we will tell you which service or partner picks it up.
REF.ENG_MATRIX // STANDARD_BOUNDARIES_APPLY
SMB (under 100 seats): 2-6 weeks end-to-end. Mid-market (100-500 seats): 6-12 weeks. Enterprise (1000+ seats) or M&A under regulatory deadline: 12-24 weeks with phased waves.
Yes. Wave-based migration means users move in batches; pre-wave coexistence (mailbox forwarding, file shortcuts) keeps the business running. Big-bang cutovers are only used when the wave model is impossible.
Native Microsoft cross-tenant migration now supports Teams chat with caveats. We document the caveats and tool around the gaps (typically with BitTitan or Quest).
30-minute discovery call. We tell you whether this service fits, what the scope looks like, and what the next 4 weeks would deliver. No high-pressure pitch.
Prefer a written scope before a call? Email us
Named on-call engineer for 30 days. Validation report against success criteria. Source-environment decommissioning + cost-out plan delivered to Finance. Post-mortem captured.
Mid-market 100-500 seats, M&A scenarios, or hybrid on-prem-to-cloud workload moves under 90-day deadline.
Enterprise multi-thousand-seat migrations under regulatory or M&A deadline, multi-region, with custom integration scope.